Get a Free Quote

Our representative will contact you soon.
Email
Name
Mobile/WhatsApp
Company Name
Message
0/1000

Netherlands Office Building Project

Jul.17.2025

Project scale: 62 units

 

Project Description:

 

1. Modular rapid construction system

Slide rail connection: The bottom of the container is pre-installed with slide rails, and 200㎡ office space can be assembled within 24 hours

Folding structure: Some walls use hydraulic hinges to switch between conference room ↔ open office mode within 5 minutes.

Vertical expansion: supports 2~3 layers of stacking (reinforced by external steel structure).

1.png2.png

2. Intelligent environmental control

Internet of Things (IoT) system:

Automatically adjust lighting, temperature and humidity (controlled by mobile phone app).

Energy consumption monitoring screen displays electricity consumption/water saving data in real time.

Photovoltaic glass: Some windows integrate transparent solar film (power generation 15W/㎡).

 
3.jpg5.jpg4.jpg

 

Recommended Products

Get a Free Quote

Our representative will contact you soon.
Email
Name
Mobile/WhatsApp
Company Name
Message
0/1000