Project scale: 62 units
Project Description:
1. Modular rapid construction system
Slide rail connection: The bottom of the container is pre-installed with slide rails, and 200㎡ office space can be assembled within 24 hours
Folding structure: Some walls use hydraulic hinges to switch between conference room ↔ open office mode within 5 minutes.
Vertical expansion: supports 2~3 layers of stacking (reinforced by external steel structure).
2. Intelligent environmental control
Internet of Things (IoT) system:
Automatically adjust lighting, temperature and humidity (controlled by mobile phone app).
Energy consumption monitoring screen displays electricity consumption/water saving data in real time.
Photovoltaic glass: Some windows integrate transparent solar film (power generation 15W/㎡).